Skip to content

Start a 14-day trial — no card. See the desk before you commit.

Start a trial
Back to modules

Plant and equipment

MEWP inspections

The machine, and the inspection before it goes up.

  • On the file

    The pre-use check, the thorough inspection, and the operator's ticket.

  • Duty

    PUWER 1998 and Work at Height Regulations 2005

  • Where it is used

    On the phone, before the boom goes up.

What it does

  • Pre-use check, and the thorough inspection.
  • Who is operating it, and that their ticket is in date.
  • A defect takes it out. It does not go up with a note.

On the file

  • The pre-use check
  • The thorough inspection
  • Who is operating it
  • That the ticket is in date
  • A defect, and that it is taken out

How this duty should sit

These notes describe how the duty should sit on a digital record. Pure Safety today ships incidents, observations, and actions — not a separate screen for every module on this list.

  • The pre-use check is on the phone, before the boom goes up.
  • The operator’s ticket is already on the record.

The duty

UK law. We name it. We do not invent a badge.

  • PUWER 1998 and Work at Height Regulations 2005

    Inspected, and used by a competent person.

  • Who uses it

    The operator does the pre-use check. The ticket is already on their training record.

  • Sits with

    The plant register and the work-at-height permit.

  • What good looks like

    It does not go up with a defect left on a note. The operator's ticket is in date.